Case Study: Homerton University Hospital

Project Scope & Challenge

Due to the scale and complexity of the hospital’s infrastructure, The Elec Group was appointed to carry out a comprehensive electrical testing and remedial works program.

The challenge involved delivering services across a live, high-dependency hospital environment without disrupting daily clinical operations.

Our team conducted a full site audit, meticulously identifying and mapping all distribution boards across the premises.

This detailed planning phase paved the way for the testing of approximately 6,000 distributed circuits within the facility, all while maintaining critical healthcare services uninterrupted.

Our Approach & Solutions

Understanding the importance of maintaining hospital operations, The Elec Group deployed a specialist project team dedicated solely to Homerton. We aligned our delivery model with the hospital’s operational priorities, ensuring minimal disruption to patients, staff, and students.

By coordinating closely with the hospital’s Operations and Estates teams, we implemented a phased testing and remedial strategy that delivered maximum efficiency and clear communication between departments. The plan included regular progress updates, monthly reporting, and strict adherence to BS 7671 standards throughout the contract period.

Client Overview

Homerton University Hospital, located in the London Borough of Hackney, is a prominent teaching hospital operated by the Homerton University Hospital NHS Foundation Trust.

With a workforce of over 3,500 staff, the hospital is a critical healthcare hub specialising in obstetrics, neonatology, fetal medicine, laparoscopic surgery, fertility, bariatric and obesity surgery, and neurorehabilitation

Key Deliverables

  • Full Fixed Wire Testing across 6,000 circuits

  • Electrical remedial works carried out in tandem with testing

  • Site-wide compliance ensured with minimal disruption

  • Contract delivered within a 3-year timeframe as scheduled

Results & Benefits

BS 7671 – Electrical Remedial Works

Our experienced engineering team carried out critical remedial works alongside Fixed Wire Testing. This proactive approach streamlined compliance, optimised resource use, and ensured the hospital met all statutory requirements efficiently.

BS 7671 – Electrical Installations

A total of 6,000 circuits were tested and documented in accordance with the agreed plan, with all works completed on time and within the three-year contract period.

Case Study: McCarthy & Stone – Supported Living

Project Scope & Challenge

The Elec Group was commissioned to undertake a nationwide program of Portable Appliance Testing (PAT) and Fixed Wire Testing across McCarthy & Stone’s extensive network of supported living properties.

Due to the nature of these environments—home to elderly and often vulnerable residents—our team had to plan and execute testing with the utmost sensitivity, professionalism, and attention to detail. The scale and diversity of the sites required a flexible, personalised approach tailored to the specific operational needs of each property.

Our Approach & Solutions

To meet the unique challenges of supported living settings, The Elec Group developed a bespoke compliance testing plan in close collaboration with McCarthy & Stone’s management team.

We created a coordinated national schedule that accounted for:

  • Resident accessibility and comfort

  • Regional variations in building layout and equipment

  • Site-specific operational hours

  • Local staffing and management preferences

Our experienced engineers delivered testing in a discreet, respectful, and efficient manner, ensuring minimal disruption to residents while maintaining the highest standards of electrical safety and compliance.

Client Overview

McCarthy & Stone is the UK’s leading developer and manager of retirement communities, providing high-quality supported living for older adults.

With a portfolio of over 1,000 properties nationwide, their mission is to support independence and peace of mind through safe, comfortable, and well-maintained living environments.

Key Deliverables

  • PAT Testing and Fixed Wire Testing at over 1,000 properties across the UK

  • Personalised testing plans tailored to each facility

  • Flexible scheduling to accommodate supported living environments

  • Ongoing communication with site managers and head office teams

Results & Benefits

BS 7671 – Fixed Wire Testing

All properties received thorough Fixed Wire Testing to ensure compliance with BS 7671 regulations. Testing was carried out efficiently and systematically, with clear documentation provided for each site.

PAT Testing – Resident Safety First

We tested thousands of portable appliances across all locations, prioritising resident safety and compliance. Our engineers maintained strict safeguarding protocols throughout the program.


 

The Elec Group continues to support the UK’s leading supported living providers through reliable, respectful, and fully compliant electrical testing services—ensuring peace of mind for residents and management alike.

City & Guilds
DBS Checked
Construction Line
NIC EIC
Feefo
BAFE
ISO